Skip to content
CarpentryBoys Inc. — Craft With Excellence
Call or text289-242-3402647-447-6477
Framed walls and open-web floor joists inside a new home under construction

Vaughan · Home Additions

Home Additions in Vaughan

Grandparents living with the family drive many Woodbridge and Maple additions, and a main-floor bedroom suite with its own bathroom keeps them off the stairs. In Glen Shields, 1970s and 1980s side-splits gain second storeys. Inside the Woodbridge and Maple heritage districts, the addition goes at the rear or side, below the original roofline.

Call or text

7 AM – 7 PM, 7 days a week. Free site visit and written quote.

Request a Quote

Additions in Vaughan

What’s different in Vaughan

What’s different in Vaughan
Permit officeCity of Vaughan Building Standards Department (official site, opens in a new tab)
Zoning checkCoverage, height and setbacks under Zoning By-law 001-2021.
VariancesVaughan’s Committee of Adjustment: about three to four months to a decision, then a 20-day appeal period.
Tree permitsAny tree of 20 cm or more near the work needs a permit.
Heritage districtsAdditions in Woodbridge, Maple, Thornhill and Kleinburg-Nashville need a heritage permit first.
Valley lotsTRCA permit under O. Reg. 41/24 before the building permit. Allow six to ten weeks.

Worth knowing first

Heritage district additions: rear or side, below the original roofline

Inside Vaughan’s Thornhill, Maple, Woodbridge and Kleinburg-Nashville districts, an addition needs a heritage permit before the building permit. The district plans favour additions at the rear or side, set back from the main facade. They should sit lower than or match the original roofline, with compatible materials and window proportions. Contributing heritage buildings get closer scrutiny than newer houses in the district. Larger proposals go to the Heritage Vaughan Committee. Allow 2 to 4 months for heritage review, and design to the plan from the start rather than adjusting after comments.

Roof trusses set on a new wood-framed addition

The scope, pricing tiers and 5-step process are the same everywhere we work. See Home Additions ›

Frequently asked questions

Additions in Vaughan: three local questions

A Committee of Adjustment application, and 3 to 4 months from filing to a final decision. The application includes drawings, a survey and the variances requested. The City circulates it, notifies neighbours and posts a sign before the hearing, and a 20-day appeal period follows. The committee applies the Planning Act’s four tests, so modest relief on coverage or setbacks has a good chance, while large height increases draw scrutiny.

On many Woodbridge bungalow lots, yes, and some need a variance. An engineer checks whether the existing foundation and walls can carry the load, and specifies reinforcement where needed. Inside the Woodbridge heritage district, a heritage permit adds review of height and roofline. Families move out for part of the build while the roof is open.

Yes, if any part of the addition, grading or construction access falls in the TRCA’s regulated area. That covers the Humber River valley slopes, floodplain and an allowance beyond the top of slope, and many Kleinburg and Woodbridge rear yards back onto it. The permit under Ontario Regulation 41/24 comes before Vaughan issues the building permit. Expect a geotechnical report on slope stability and 6 to 10 weeks of review.

Additions In Vaughan? Let’s Talk.

Book a free site visit. You'll get a written, itemised quote and a straight answer on permits and timing.

Financing available through Financeit. See options