Skip to content
CarpentryBoys Inc. — Craft With Excellence
Call or text289-242-3402647-447-6477
Stone bungalow with black roof and large windows on a rural lot

Hamilton · Custom Home Construction

Custom Home Construction in Hamilton

Infill rules shape every Hamilton knock-down rebuild: a professional grading plan, radon mitigation details on the drawings, and an information notice on site under By-law 21-207. Near the escarpment brow or Spencer Creek, an NEC permit and a Hamilton Conservation Authority permit both come before the City's.

Call or text

7 AM – 7 PM, 7 days a week. Free site visit and written quote.

Request a Quote

Custom Homes in Hamilton

What’s different in Hamilton

What’s different in Hamilton
Permit officeCity of Hamilton Building Division, Planning and Economic Development Department (official site, opens in a new tab)
Infill noticeBy-law 21-207: posted before demolition and within 5 business days of construction. At least 0.61 by 0.41 m.
Radon detailsRequired on every new low-rise home. 100 mm (4 in) sub-slab pipe rough-in, 6 mil poly.
Grading planProfessional plan so new roof and lot drainage stays off the neighbour's yard.
Escarpment and creeksHamilton Conservation Authority for Spencer Creek, Red Hill Creek and the Dundas Valley. NEC permit near the brow.
Heritage districtsCross-Melville in Dundas: a new house must fit the district plan.
Old services1950s lots: undersized or lead water service and clay lateral. Replace both to the property line.

Worth knowing first

Escarpment brow lots need three approvals before the City's

A view lot near the Mountain brow or a ravine lot off Spencer Creek can sit inside the Niagara Escarpment Commission's area of development control and the Hamilton Conservation Authority's regulated area. Expect an NEC development permit, a conservation permit under Ontario Regulation 41/24, and a geotechnical report setting a stable-slope setback. All 3 come before the City building permit and can add several months. On some Dundas Valley lots they also limit grading and decide where the house sits. We confirm which agencies apply before you pay for full architectural drawings.

Framer in a hard hat working on the wall framing of a new house

The scope, pricing tiers and 5-step process are the same everywhere we work. See Custom Home Construction ›

Frequently asked questions

Custom Homes in Hamilton: three local questions

Yes. The City of Hamilton requires radon mitigation details on the permit drawings for every new low-rise home. The common option is a sub-slab rough-in: a 100 mm (4 in) PVC pipe from granular fill under the slab, capped and labelled, 6 mil polyethylene lapped 300 mm, and sealed slab edges. If a later test exceeds Health Canada's 200 Bq/m³ guideline, a fan goes on the pipe.

Under By-law 21-207, a demolition and new detached house needs an information notice on each street-facing lot line. The sign is at least 0.61 by 0.41 m (24 by 16 in), weatherproof, and posted before demolition and within 5 business days of construction. The City also wants black-and-white front and rear elevation renderings at 300 dpi with the permit. We prepare and post them.

Yes, and the City of Hamilton names a new house with a self-contained unit as an ADU example. Designing it in costs far less than retrofitting. Plan a separate entrance, fire separation, interconnected smoke and CO alarms, separate heating or duct separation, and full basement height. The unit needs its own municipal address. Renting it in Ward 1, 8 or part of 14 also needs a rental licence.

Custom Homes In Hamilton? Let’s Talk.

Book a free site visit. You'll get a written, itemised quote and a straight answer on permits and timing.

Financing available through Financeit. See options