Skip to content
CarpentryBoys Inc. — Craft With Excellence
Call or text289-242-3402647-447-6477
Two-tone kitchen with wood island and white upper cabinets

Etobicoke · Kitchen Renovations

Kitchen Renovations in Etobicoke

Plaster on wood lath, a swinging door and a bearing wall to the dining room: that is the 1930s Kingsway kitchen. Markland Wood and Eatonville side-splits hide the main supply duct in the same wall. So the engineer’s flush beam and the new duct route go on one set of stamped drawings for Toronto Building.

Call or text

7 AM – 7 PM, 7 days a week. Free site visit and written quote.

Request a Quote

Kitchens in Etobicoke

What’s different in Etobicoke

What’s different in Etobicoke
Permit officeToronto Building, Etobicoke York District (City of Toronto) (official site, opens in a new tab)
Permit triggerBearing wall removed, drains moved, new window or door opening, or a rear extension rebuilt.
Structural drawingsEngineer-stamped beam design filed with Toronto Building’s Etobicoke York district.
Electrical service60 A and 100 A services upgraded to 200 A with Toronto Hydro, under an ESA permit.
Condo approvalHumber Bay Shores and Etobicoke Centre corporations approve first. Allow 2–4 weeks.
Pre-war materialsPlaster, floor tile and insulation tested for asbestos before demolition in Kingsway houses.

Worth knowing first

Split-level kitchens: the beam and the duct share one wall

In Markland Wood, Eatonville and Richview side-splits, the kitchen sits on the middle level beside the dining room, a half-flight below the bedrooms. The wall between kitchen and dining room carries the upper level and hides the main supply duct. Take it out without a plan and the bedrooms lose their heat. So the engineer sizes a flush beam while we design the new duct route through a bulkhead or the floor system. Both go on the stamped drawings for Toronto Building. That adds about two to three weeks before demolition, and it is settled before cabinets are ordered.

Grey and white kitchen with quartz island

The scope, pricing tiers and 5-step process are the same everywhere we work. See Kitchen Renovations ›

Frequently asked questions

Kitchens in Etobicoke: three local questions

Written approval, through an alteration or indemnity agreement. Expect to provide a scope or drawings, a certificate of insurance naming the corporation, WSIB clearance, and elevator and loading-dock bookings. Many buildings limit noisy work to set hours, require corridor protection and forbid moving plumbing away from the existing stack. Approval commonly takes two to four weeks, so we submit the package the day you sign.

It will if the house still has a 60 A or 100 A service and the new load exceeds it. An induction range, wall oven, dishwasher and counter circuits can outrun an older panel, more so with a heat pump or EV charger planned. The electrician runs a load calculation first. If it fails, we upgrade to 200 A under an ESA permit and book Toronto Hydro for the disconnect and reconnect.

Yes. Pre-1980s homes can contain asbestos in plaster, joint compound, vinyl floor tiles and adhesive, pipe wrap and vermiculite. Kingsway and Humber Valley houses renovated several times carry layers from different decades. We have samples taken from every area being opened. If a result is positive, a specialist removes the material under Ontario’s asbestos rules before our crew starts, adding a few days to two weeks.

Kitchens In Etobicoke? Let’s Talk.

Book a free site visit. You'll get a written, itemised quote and a straight answer on permits and timing.

Financing available through Financeit. See options